GK Knutson in no stranger to multi-phased construction projects with students on-site and this one is no exception.  We enjoy equipping students with the latest technology and bright learning spaces to study, connect, and grow.  It took more than 31,000 hours and nearly 3 years, but now the community will be able to benefit from…

Read More

Three years, three phases, and 7,300 GK Knutson hours at Blaine High School resulted in the construction of a new cafeteria, theater, technical education classrooms, a new two-story classroom wing and the remodel of an existing science/library wing. General Contractor: Spee West Construction Subcontract Amount: $868,000 Scope: Exterior Metal Framing Interior Metal Framing Shaftwall Systems Interior GWB…

Read More

The Western Washington University Carver Gym renovation and restoration project consisted of extensive remodels to two existing and historic gym buildings, in addition to a new three-story structure, situated between and incorporating the two existing gyms under one roof. The project included 81,000 square feet of renovation, 25,000 square feet of replacement, and over 57,000…

Read More

Willow Hall is one of 3 dormitories in the UW North Campus Housing Project that replaced the 1960’s McCarty Hall. This 8-story structure houses more than 500 students as well as many of the common areas in the complex, including multiple dining spaces, study lounges, game rooms, and storage facilities. We worked more than 30,000…

Read More

At the time it was built, Mt. Si High School was the largest high school in the Washington State, designed to serve up to 2,300 students. The seven buildings are comprised of three stories with greenhouses on top, and a 400-car ground-level garage. GK Knutson contributed over 70,000 hours to this massive 300,000 SF project.…

Read More

Part of the Edmonds School Districts capital project improvements included Lynndale Elementary School. A 76,000 square foot, ground up, building on the existing site of the previous building, which was built in 1956. GK Knutson worked for BNBuilders, self-performing all the metal framing, door frame installation, gypsum wallboard installation and finishing scopes on the project,…

Read More

Just south of Bellevue, Enatai Elementary School was completely demolished and rebuilt. The 95,000 square foot school was built with sustainability in mind and incorporates many ‘green technologies’ including geothermal, solar, and photovoltaic systems. Working on another school project with Spee West Construction, GK Knutson performed all the metal framing, exterior sheathing, and interior drywall work.…

Read More

Spee West Construction won the bid on the new Tillicum Middle School, and we are happy to have been part of the construction team. With a final subcontract value of over $2.5 million dollars, GK Knutson worked nearly 28,000 hours on the project and self-performed all the metal framing and drywall scope. The 181,000 square foot…

Read More

Partnering on another high school project with Spee West Construction, Federal Way High School was a two-phased, rebuild of the existing high school that shared the same site. With 236,000 square feet of new construction, it will greatly improve the capacity of the original school. The work on the project was completed out over a…

Read More

Partnering on another school project with Spee West Construction, Sammamish High School was nearly a complete rebuild of the existing high school that shared the same foot print. With 320,000 square feet of new construction, it is one of the larger high schools in the state. The project was multi-phased and spread the work out…

Read More